I just finished the floors for 2 rooms. I haven't stuck them to the House structure yet as I still need to let the shellac dry properly and then add a coat of clear wax.
Music Room
Dining Room
Finishing the floors went well. AS I mentionned in an earlier post I used shellac flakes dissolved in 99% isopropyl rubbing alcohol. When the wood boards were glued onto the illustration board subfloor, I sanded them with 80 and 120 gritt sandpapers. I applied a coat of shellac (I used Garnet color shellac flakes), let it dry 30 minutes, then gently went over it with a 0000 steel whool. I repeated these steps 3 times. The shellac goes on easily, but you have to work very fast and not go over your strokes. A few times I did just that and there are marks on the finish, but since I wanted the floors to look old it worked out very well.
I also finished the Dining Room floor. For this room I purchased miniature parquet sheets and glued them onto an illustration board subfloor and then finished the same as the music room floor with Shellac. The dining room floor took about 30 minutes to put together whereas the music room floor took 3 weeks (I usually work on my miniatures one day each weekend and maybe 1 or 2 evenings a week). Doing the detailed floor from scratch was much longer, however one must take the price into account: The music Room floor (20" x 36") cost about $45.00 versus the Dining Room Floor (16" x 20") which cost about $135.00.
